---
title: Modular structures and port layout
description: "10 years ago, Locabri installed 1500m2of storage space on their site within 3 months in
order to meet customer demand."
---

[Loca'blog: understand everything about the modular ](https://www.locabri.com/en/blog)

# [Modular structures and port layout](https://www.locabri.com/en/blog/modular-structures-and-port-layout)

 Written by Charlene Gilardi | Oct 11, 2019 1:16:00 PM

Francis Grimaud, Director of EVA, gives us his view on the use of Locabri modular structures.

EVA, Etablissement Vraquier de l'Atlantique, is a subsidiary of the port groups [Sica Atlantique](https://www.sica-atlantique.com/) and [Maritime Kuhn](https://maritimekuhn.com/). It manages three terminals in the Port of La Rochelle.

EVA is a port operator, stevedore and stock manager and has 27,500 m² of covered storage space.

 

Ten years ago, a new market was to be set up in the Port of La Rochelle.

The specification was to store raw materials for animal food and to keep them clean and in good condition.

To meet this new customer, Sica Atlantique and Martime Khun joined forces and created the company EVA. EVA was looking for a solution to quickly install additional covered square metres in the Port La Pallice-La Rochelle.

Initial discussions were held with Locabri in order to find a solution that was both economical and reliable over time. EVA's objective was to deploy a solution very quickly and to be able to reuse the buildings once the contract was awarded.

[Modular buildings](https://www.locabri.com/en/) were chosen because they can be moved from one site to another and also because of the speed of deployment, which appealed to the interviewers.

 

Read more : Francis Grimaud's interview

 

In order to fully understand the issues and the results obtained in the port context, a brief [case study](https://www.locabri.com/telecharger-letude-de-cas-sica-atlantique) summarises the main points of the EVA - Etablissement Vraquier de l'Atlantique case.

[View full post](https://www.locabri.com/en/blog/modular-structures-and-port-layout)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Charlene Gilardi"
  },
  "dateModified" : "2023-02-03T14:37:28.497Z",
  "datePublished" : "2019-10-11T13:16:00Z",
  "headline" : "Modular structures and port layout",
  "image" : {
    "@type" : "ImageObject",
    "height" : 450,
    "url" : "https://3526548.fs1.hubspotusercontent-na1.net/hubfs/3526548/Structures%20modulaires%20et%20implantation%20portuaire.jpg",
    "width" : 600
  },
  "mainEntityOfPage" : "https://www.locabri.com/en/blog/modular-structures-and-port-layout",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60.0,
      "url" : "https://cdn2.hubspot.net/hubfs/3526548/locabri%202018/images/logo-landing-page.png",
      "width" : 292.65308
    },
    "name" : "English Loca'Blog : Think outside the walls"
  }
}
```